| 1 |
Village |
The administrative boundaries of villages around KSCS |
20-04-2024 |
| 2 |
Distric |
The administrative boundaries of districts around KSCS |
20-04-2024 |
| 3 |
Regency |
The administrative boundaries of regencies around KSCS |
20-04-2024 |
| 4 |
Province |
The provincial administrative boundaries around KSCS |
20-04-2024 |
| 5 |
BM-CP |
The position points of benchmark (BM) and control point (CP) |
21-04-2024 |
| 6 |
Countour |
Minor and major contour lines with a height interval of 0.5 meters |
21-04-2024 |
| 7 |
Fault Line |
The locations and characteristics of geological fractures in the Earth crust |
22-04-2024 |
| 8 |
Geology Formation |
Represent the composition, structure, and distribution of rock formations |
22-04-2024 |
| 9 |
Jaringan listrik |
PLN's power grid: 500 kV Extra High Voltage Transmission Line (SUTET), 150 kV High Voltage Transmission Line (SUTT), and 70 kV Medium Voltage Transmission Line (SUTT) |
23-04-2024 |
| 10 |
Gardu Internal |
PLN's electrical substations: 150 kV and 70 kV substations |
23-04-2024 |
| 11 |
Penlok |
The project site delineation boundary for KSCS |
23-04-2024 |
| 12 |
Reservoir |
The boundary of the reservoir inundation area for the Karian Dam |
24-04-2024 |
| 13 |
Intake Ciuyah |
The location of the Ciuyah intake |
24-04-2024 |
| 14 |
Tunnel Ciuyah |
The Ciuyah tunnel |
24-04-2024 |
| 15 |
Trace center line |
The pipeline network route of KSCS |
25-04-2024 |
| 16 |
Trace station line |
The pipeline network stations of KSCS |
25-04-2024 |
| 17 |
Crossing |
The locations of pipeline crossings with rivers, roads, and railway lines in KSCS |
26-04-2024 |
| 18 |
River |
The river lines intersecting the KSCS pipeline network, starting from the upstream, including its tributaries |
27-04-2024 |
| 19 |
Watershed |
The watershed boundaries (Daerah Aliran Sungai/DAS) with observation points on the KSCS pipeline network |
28-04-2024 |
| 20 |
Test Pit |
The location points for test pit investigations |
29-04-2024 |
| 21 |
Sondir |
The location points for cone penetration testing (CPT) investigations |
29-04-2024 |
| 22 |
Bore |
The location points for machine borehole investigations |
29-04-2024 |
| 23 |
Air valve |
The location points for air valves |
30-04-2024 |
| 24 |
Road |
Highway and road layer |
03-05-2024 |
| 25 |
Package |
Geographic extent or boundaries of the project package area |
03-05-2024 |
| 26 |
WTP |
WTP layers provide data on the locations and infrastructure of Water Treatment Plants |
05-05-2024 |
| 27 |
Health Facilities |
Locations of hospitals, clinics, medical centers, and other healthcare facilities |
06-05-2024 |
| 28 |
Isolation Valve |
Locations of isolation valve |
13-05-2024 |